Ulaanbaatar
Ulaanbaatar station, Trans-Mongolian hub
Road-rail plant with certified operators, road-rail operators and rail training for your projects in Mongolia: Ulaanbaatar, Erdenet, Darkhan.
Network of about 2,000 km, 1,520 mm broad gauge, mostly non-electrified. Infrastructure and operations: Mongolian Railways (UBTZ / MTZ).
Trans-Mongolian Russia–China line, new coal lines to the Chinese border (Tavan Tolgoi–Gashuun Sukhait), Ulaanbaatar commuter rail project.
GROUPE ARROUGÉ studies jobs in Mongolia case by case: road-rail MEWPs and excavators shipped by road or sea with their certified operators, operators provided on long-distance assignment, training of local teams with AK FORMATION, as a subcontractor to French companies or in partnership with local players.
Our road-rail plant is built for 1,435 mm standard gauge; compatibility with the gauge in use in Mongolia (1,520 mm broad gauge) and approval by the infrastructure manager are confirmed during the study.

Ulaanbaatar station, Trans-Mongolian hub
mining branch to Erdenet
Darkhan station on the corridor to Russia
Electric and diesel road-rail elevating work platforms for overhead line, tunnels, signalling and structures.
Find out moreRoad-rail excavators with track attachments: earthworks, laying and removal, handling of sleepers and rails.
Find out moreCertified drivers provided on your own machines, by day or by night.
Find out moreAK FORMATION sessions: SECUFER, ASP, road-rail operation, overhead-line authorisations, first aid.
Find out moreYes, subject to study: road-rail MEWPs and excavators are shipped by low-loader, container or ro-ro with their certified operators. Lead times, customs formalities and local approval are built into the quote.
The network in Mongolia uses 1,520 mm broad gauge. Our plant is built for standard gauge; adaptation to another gauge is studied with the manufacturer before any mobilisation.
Yes. AK FORMATION designs in-house sessions in French or English, on site in Mongolia or in France: rail safety, road-rail MEWP and excavator operation, overhead-line work, first aid.
Yes. We work as a subcontractor to French or European companies engaged in Mongolia, and in partnership with local companies: provision of plant and operators, technical support, training.

Technical data sheets for every MEWP, excavator and dumper, pages for 99 French cities, road-rail expert guides and a detailed quote form.
Visit arrougerailservice.com
Detailed programmes, session calendar, OPCO / CPF / France Travail funding, e-learning platform and online enrolment.
Visit the AK FORMATION websiteDescribe the job: machines, duration, location, constraints. Answer within 24 working hours.
Company websites: arrougerailservice.com · AK FORMATION