Kinshasa
Central station, Matadi–Kinshasa line, urban train
Road-rail plant with certified operators, road-rail operators and rail training for your projects in the Democratic Republic of the Congo: Kinshasa, Lubumbashi, Mbuji-Mayi.
Network of about 3,600 km, several gauges (standard and narrow gauges), mostly non-electrified. Infrastructure and operations: SNCC / SCTP.
Katanga network (SNCC) toward Zambia and Angola via the Lobito corridor, Matadi–Kinshasa line, rehabilitation supported by the World Bank.
GROUPE ARROUGÉ studies jobs in the Democratic Republic of the Congo case by case: road-rail MEWPs and excavators shipped by road or sea with their certified operators, operators provided on long-distance assignment, training of local teams with AK FORMATION, as a subcontractor to French companies or in partnership with local players.
Our road-rail plant is built for 1,435 mm standard gauge; compatibility with the gauge in use in the Democratic Republic of the Congo (several gauges (standard and narrow gauges)) and approval by the infrastructure manager are confirmed during the study.

Central station, Matadi–Kinshasa line, urban train
SNCC hub, mining traffic toward Sakania and the Lobito corridor
Ilebo–Lubumbashi line, Mwene-Ditu station nearby
Electric and diesel road-rail elevating work platforms for overhead line, tunnels, signaling and structures.
Find out moreRoad-rail excavators with track attachments: earthworks, laying and removal, handling of sleepers and rails.
Find out moreCertified drivers provided on your own machines, by day or by night.
Find out moreAK FORMATION sessions: SECUFER, ASP, road-rail operation, overhead-line authorisations, first aid.
Find out moreYes, subject to study: road-rail MEWPs and excavators are shipped by low-loader, container or ro-ro with their certified operators. Lead times, customs formalities and local approval are built into the quote.
The network in the Democratic Republic of the Congo uses several gauges (standard and narrow gauges). Our plant is built for standard gauge; adaptation to another gauge is studied with the manufacturer before any mobilization.
Yes. AK FORMATION designs in-house sessions in French or English, on site in the Democratic Republic of the Congo or in France: rail safety, road-rail MEWP and excavator operation, overhead-line work, first aid.
Yes. We work as a subcontractor to French or European companies engaged in the Democratic Republic of the Congo, and in partnership with local companies: provision of plant and operators, technical support, training.

Technical data sheets for every MEWP, excavator and dumper, pages for 99 French cities, road-rail expert guides and a detailed quote form.
Visit arrougerailservice.com
Detailed programs, session calendar, OPCO / CPF / France Travail funding, e-learning platform and online enrolment.
Visit the AK FORMATION websiteDescribe the job: machines, duration, location, constraints. Answer within 24 working hours.
Company websites: arrougerailservice.com · AK FORMATION