Baghdad
Baghdad central station, metro project
Road-rail plant with certified operators, road-rail operators and rail training for your projects in Iraq: Baghdad, Basra, Mosul.
Network of about 2,300 km, standard gauge (1,435 mm), mostly non-electrified. Infrastructure and operations: Iraqi Republic Railways.
Baghdad–Basra–Umm Qasr network under rehabilitation, Development Road project toward Türkiye, Baghdad metro project.
GROUPE ARROUGÉ studies jobs in Iraq case by case: road-rail MEWPs and excavators shipped by road or sea with their certified operators, operators provided on long-distance assignment, training of local teams with AK FORMATION, as a subcontractor to French companies or in partnership with local players.
Our road-rail plant is built for 1,435 mm standard gauge, the gauge in use in Iraq; approval by the infrastructure manager is confirmed during the study.

Baghdad central station, metro project
Basra station, port of Umm Qasr, Al-Faw port under construction
Mosul station, line to Baghdad to be rehabilitated
Electric and diesel road-rail elevating work platforms for overhead line, tunnels, signaling and structures.
Find out moreRoad-rail excavators with track attachments: earthworks, laying and removal, handling of sleepers and rails.
Find out moreCertified drivers provided on your own machines, by day or by night.
Find out moreAK FORMATION sessions: SECUFER, ASP, road-rail operation, overhead-line authorisations, first aid.
Find out moreYes, subject to study: road-rail MEWPs and excavators are shipped by low-loader, container or ro-ro with their certified operators. Lead times, customs formalities and local approval are built into the quote.
The network in Iraq is standard gauge (1,435 mm), the gauge our road-rail plant is built for.
Yes. AK FORMATION designs in-house sessions in French or English, on site in Iraq or in France: rail safety, road-rail MEWP and excavator operation, overhead-line work, first aid.
Yes. We work as a subcontractor to French or European companies engaged in Iraq, and in partnership with local companies: provision of plant and operators, technical support, training.

Technical data sheets for every MEWP, excavator and dumper, pages for 99 French cities, road-rail expert guides and a detailed quote form.
Visit arrougerailservice.com
Detailed programs, session calendar, OPCO / CPF / France Travail funding, e-learning platform and online enrolment.
Visit the AK FORMATION websiteDescribe the job: machines, duration, location, constraints. Answer within 24 working hours.
Company websites: arrougerailservice.com · AK FORMATION